Web Server Disaster Recovery Plan




Download 43 Kb.
bet1/5
Sana29.03.2021
Hajmi43 Kb.
#13673
  1   2   3   4   5

Greg Vogl Library Technology Services Updated 2006-03-16

Web Server Disaster Recovery Plan
The Web server Snook was moved to a new Dell PowerEdge 2850 server on March 13, 2006.

Also see previous migration plan (migration.html, includes detailed system administration notes)




  1. Prepare a server (or create virtual hosts on an existing server such as Vulture)

    1. Create partitions for /boot=0.5G, 3 /swap=2G each, and a volume group vg0=100G

    2. Create logical volumes lv0=/=5G, lv1=/tmp=5G, lv2=/usr=5G, lv3=/home=3G, lv4=/var=10G, lv5=/var/www=10G, lv6=/usr/local/Content=20G

  2. Install RedHat Enterprise Linux 4

  3. Install and test important server applications

    1. Files and mail: httpd 2.0.52 (Apache) , samba 3.0.10, sendmail 8.13.1, commvault


    2. Download 43 Kb.
  1   2   3   4   5




Download 43 Kb.