• Application Operating System Selection / Design
  • Quality management review procedure




    Download 42.57 Kb.
    bet2/8
    Sana21.03.2017
    Hajmi42.57 Kb.
    #597
    1   2   3   4   5   6   7   8

    Pre-Deployment Checklist



    Server Name

    1. What is the name of the server?


    Environmental Design

    1. Is this a Physical or Virtual server? (Note: If either physical server or virtual host is required, see ITD Purchasing Procedure for tender process)

    2. Is this a physical to virtual conversion of an existing server [Y/N]?


    Application & Operating System Selection / Design

    1. What application(s) will run on the server?

    2. What operating system does the application require

    3. What processor(s) (GHz) does the application require?

    4. What memory (RAM) does the application require?

    5. What hard disk space (gigabytes) does the application require?




    Download 42.57 Kb.
    1   2   3   4   5   6   7   8




    Download 42.57 Kb.

    Bosh sahifa
    Aloqalar

        Bosh sahifa



    Quality management review procedure

    Download 42.57 Kb.