• New Business 30 min
  • Charrette
  • Action item: Alan to distribute final letter for SBC review, Alex and Charlie to relay final approval




    Download 77 Kb.
    bet3/4
    Sana29.06.2021
    Hajmi77 Kb.
    #15262
    1   2   3   4
    Action item: Alan to distribute final letter for SBC review, Alex and Charlie to relay final approval

    • Annual report planning progress and gaps review (Ken, Jennifer)

    Final document anticipated mid-April. Jennifer to connect with Ken regarding the need for any additional text to be drafted.

    • High school representative: school-based initiatives update (Andrew/Ariel)

    No update, and no recent contact with high school rep. Alan and Ariel to coordinate contact information.

    • Beacon Street check-in
      - What is the current timeline for construction?
      - What is planned in terms of patching/temporary resurfacing until construction begins?

    Gas utility work planned for this summer. There has been difficulty securing all necessary easements for the reconstruction work, and the City’s legal department is currently dealing with this. Because of this, the timeline for construction is in limbo and could not be confirmed.



    Minimal patching work will take place around utility work. SBC members asked if this could be expanded or if an interim resurfacing could be done. Since construction will take 2 seasons, it was suggested interim resurfacing could be done at the end of the street not under construction first. Other suggestions included interim shared street signage and just resurfacing the bike lane. Jennifer has been compiling a list of interim asks.
    New Business 30 min

    • Letter that Bike to the Sea will ask us to endorse re: biking conditions that the casino will worsen but can be "fixed'. (Alan)

    See Status of co-signed Mystic crossing request letter to EEA and Gaming Commission (Alan) above

    • Report-out from Visioning subcommittee (Tegin/Jennifer)

    A brief summary of the work of this subcommittee was given, and members expressed general approval for continuing in this direction

    • Union Square charrette news (multiple)

    The ‘early action plan’ for Union Square were discussed. Comments the SBC had submitted were being considered for incorporation into plans, and the next public meeting was tentatively planned for April. 25% drawings have been done, and Washington Street from Somerville Avenue to McGrath (to MassDOT scope of work) are expected to be included in 75% drawings and presented at next public meeting.

    • Rush Hour Race--go/no-go and planning (Ken)

    A joint event with SBC and Boston Cyclist Union was discussed. This to be fundraiser for BCU. A tentative route is planned from somewhere in downtown Boston to Aeronaut Brewery. Committee expressed general support for plan.

    • Other Bay State Bike Week events? (Ken)

    No update

    • Seasonal Markings Update ( Jennifer)

    No update, will follow up by email
    Charrette 50 min

    • Advisory bike lanes and protected intersections 101 (Tom Bertullis)

    Tom gave presentation and a lively discussion ensued, presentation subsequently distributed to SBC members through email for additional review.

    • Davis Square 75% streetscape plans (all)

    No update, Will follow up by email