|
Etsi tc LI 06litd025 page of etsi/tc li#06 Povoa de Varzim, Portugal, 23-25 July 2004
|
bet | 18/19 | Sana | 03.07.2021 | Hajmi | 95 Kb. | | #15372 |
Commentary
Figure 8 shows the essentials of LI arrangements based on the provision and operation of an IIF at each access point. Note that the specific details will vary depending on the particular arrangements of access point and AAA functions and how these might be connected.
In general, there is an individual link between each IIF and the LIAF. There will usually be a link from the MF to central AAA functions, but the necessary information could also be retrieved from the access point.
The MF could be implemented with a single, centralised, instance or there may be as many MF instances as there are access points.
F igure 8: Elements of LI at the Access Point
|
| |