Implementation of the research results




Download 2,23 Mb.
Pdf ko'rish
bet43/46
Sana04.10.2024
Hajmi2,23 Mb.
#273416
1   ...   38   39   40   41   42   43   44   45   46
Bog'liq
PK2rjjpAYcv35Ki

Implementation of the research results. 
Based on the developed technical 
solutions and obtained scientific results to reduce fuel and energy costs of drilling rigs: 
a drilling rig containing a vortex cooler was introduced into the state unitary 
enterprise “Regionalgeology” (certificate of the Ministry of Mining and Geology of 
the Republic of Uzbekistan No. 08-2172 dated July 28, 2023). As a result, the speed of 
well penetration is increased by 8%, the durability of the rock-cutting tool is increased 
by 6%; 
a drilling rig that increases the efficiency of hydraulic cleaning of the well bottom 
has been introduced into the state unitary enterprise “Regionalgeology” (certificate of 
the Ministry of Mining and Geology of the Republic of Uzbekistan No. 08-2172 dated 
July 28, 2023). As a result, well penetration is increased by 8%, bit life is increased by 
5%, and mechanical drilling speed is increased by 7% relative to drilling with the rock-
cutting tool used; 
a device for recycling heat from the internal combustion engine drive of a drilling 
rig was introduced into the state unitary enterprise “Regionalgeology” (certificate of 
the Ministry of Mining and Geology of the Republic of Uzbekistan No. 08-2172 dated 


54 
July 28, 2023). As a result, a heat flow of 162 mJ (45 kW) was obtained, which can be 
used for technological needs; 
a nozzle that reduces resistance in the exhaust pipes of internal combustion 
engines has been introduced into the state unitary enterprise “Regionalgeology” 
(certificate of the Ministry of Mining and Geology of the Republic of Uzbekistan No. 
08-2172 dated July 28, 2023). As a result, a 12% reduction in fuel consumption was 
achieved based on a decrease in exhaust gas resistance; 
a device for obtaining electrical energy from the heat released by internal 
combustion engine drives was introduced into the state unitary enterprise 
“Regionalgeology” (certificate of the Ministry of Mining and Geology of the Republic 
of Uzbekistan No. 08-2172 dated July 28, 2023). As a result, electricity of 1.2 kW with 
a voltage of 36 V was obtained. 

Download 2,23 Mb.
1   ...   38   39   40   41   42   43   44   45   46




Download 2,23 Mb.
Pdf ko'rish